SNCFT key figures

SNCFT key figures

MAIN ACTIVITIES

  • Main lines passengers transportation.
  • Suburbs passengers transportation.
  • Freight transportation.

NETWORK RAIL

Tunisian rail network consists of 23 lines with a total length of 2165 km including :

  • 471 km of standard gauge lines (1437 mm);
  • 1686 km of metric gauge lines (1000 mm) in which 90 km are electrified.
  • 8 km of mixed gauge lines (standard and metric).

In addition, the rail network includes 267 train stations, stations and stops. Maximum train speed is 130 km/h on the metric gauge and 140km / h on the standard one. Maximum axle load ranges between 16 and 20 tons.

ROLLING STOCK

  • 138 locomotives
  • 30 EMUs
  • 131 hauled stocks for passengers
  • 30 DMUs.
  • 3455 Wagons (SNCFT and private owners)
  • 1461 Containers

NUMBER OF EMPLOYEES

  • 4518 employee

2017 Traffic

TRAFIC Number in millions
Suburbs passengers 36,6 P
Mainlines passengers 4,4 P
Freight 1,4 T
Phosphate 2,4 T

2017 Traffic Incomes

Incomes of thr 2016 traffic MD
Suburbs passengers 13.653
Mainlines passengers 35,565
Freight 13,378
Phosphate 22,742

Human Resources in 2017

 

 

Total workforce 4518
Supervision rate  11,8%
Average age 42 years 9 months
Female workforce 12,7%
Training 9016 Training Days Agents 

Search Your Itinerary

Start :

Arrival :

Travel Date :

Travel Time :

Hour
minutes

Schedules of trains in real time

Type train :

Timetable :

Starts     Arrivals

From :