SNCFT key figures

MAIN ACTIVITIES

  • Main lines passengers transportation.
  • Suburbs passengers transportation.
  • Freight transportation.

NETWORK RAIL

Tunisian rail network consists of 23 lines with a total length of 2165 km including :

  • 471 km of standard gauge lines (1437 mm);
  • 1686 km of metric gauge lines (1000 mm) in which 90 km are electrified.
  • 8 km of mixed gauge lines (standard and metric).

In addition, the rail network includes 267 train stations, stations and stops. Maximum train speed is 130 km/h on the metric gauge and 140km / h on the standard one. Maximum axle load ranges between 16 and 20 tons.

ROLLING STOCK

  • 138 locomotives
  • 30 EMUs
  • 131 hauled stocks for passengers
  • 30 DMUs.
  • 3455 Wagons (SNCFT and private owners)
  • 1461 Containers

NUMBER OF EMPLOYEES

  • 4518 employee

2017 Traffic

TRAFICNumber in millions
Suburbs passengers36,6 P
Mainlines passengers4,4 P
Freight1,4 T
Phosphate2,4 T

2017 Traffic Incomes

Incomes of thr 2016 traffic MD
Suburbs passengers13.653
Mainlines passengers35,565
Freight13,378
Phosphate22,742

Human Resources in 2017

 

 

Total workforce 4518
Supervision rate11,8%
Average age42 years 9 months
Female workforce12,7%
Training9016 Training Days Agents