1872
On August 2, the Tunis – La Goulette line (16 km) was inaugurated with great ceremony.1875
On September 1, the Tunis – Béja – Jendouba line was opened to serve lead mines.1876
The Bey of Tunisia granted the Batignolles Company the concession for the Tunis – Souk El Arba line.1882
The Bey granted France the railway concession rights in Tunisia.1882
The Tunis – Hammam-Lif line was put into operation in standard gauge.1884
Extension of the Tunis – Jendouba line to Ghardimaou to connect with the Algerian network.1894
Opening of the Jedeida – Bizerte line.1895
Opening of the Hammam-Lif – Sousse line.1897-1906
Opening of the Tunis – Kalaat Khasba line.1898-1909
Opening of the Sfax – Gafsa – Metlaoui line and the southern mining network.1910
Construction of Tozeur station.1911
Construction of Sfax station.1912
Opening of the Sousse – Sfax line.1916
Construction of Gabès station.1922
Tunisia repurchased previous concessions; Bône-Guelma became the “Farming Company of Tunisian Railways”.1930
Connection of the Tunis – Kalaat Khasba line with the Algerian network.1935
World speed record for diesel railcars between Tunis and Sfax.1940
Opening of the Heidra – Kasserine line.1956
Railway operations entrusted to SNCFT from January 1957.1957
Merger of the Sfax–Gafsa company with SNCFT.1983
Double-track electrified Sousse – Monastir line put into service.1984
Monastir – Mahdia line opened.1987
Double track Monastir – Moknine.1988
Double track Tunis – Jedeida.1989
Monastir – Mahdia line put into service.1993
SNCFT–FGS agreement and creation of the Hammam Lif Railway School.1995
Tariff reforms and approval of the staff law.1996
Third track between Tunis and Hammam Lif.1997
Rehabilitation of the Sfax – Gabès line.1998
Creation of technical and commercial business units.1999
Purchase of locomotives and double tracking Borj Cédria – Bir Bou Regba.2000
Rail network modernization and track doubling.2001
State–SNCFT agreement for main lines.2002
Recovery plan and reduced Tunis–Gabès travel time.2003
Fast link Kalaa Sghira – Msaken.2004
European funding and network modernization.2005
Digitalization, simulator, and freight modernization.2006
Fiber optics, GSM-R, and global modernization.2007
Online sales and signaling upgrades.2008
Railway museum and suburban electrification.2009
New stations and modern trainsets.2010
Express railcars and phosphate network fiber optics.2011
Acquisition of modern trains.2014
Electrification and rolling stock modernization.2015
Tourist train “The Desert Rose”.2016
Contracts and acquisition of RFR trainsets.2019
Acquisition of RFR trainsets.2020
Phosphate locomotives acquisition.2023
Opening of Line E Tunis – Bougatfa.2025
Opening of Line D Tunis – Gobaa Ville.